What Is the Current Condition of the Mugling–Kathmandu Road?
What Is the Current Condition of the Mugling–Kathmandu Road? New Track at Galchhaundi and Construction of the Benighat–Fishling Alternative Road Dhading, October 22, 2026 The Prithvi Highway, a major road connecting Kathmandu with various districts across Nepal, has recently faced disruptions due to landslides, road subsidence, and river erosion along sections of the Mugling–Kathmandu route. After the road collapsed due to erosion by the Trishuli River in the Galchhaundi area of Dhading, traffic was disrupted. A new track was constructed by cutting into the hillside, allowing vehicles to resume operations. Reports published on October 11 stated that the road had reopened. Earlier, the Krishna Bhir section of Dhading also faced road subsidence caused by erosion from the Trishuli River, disrupting traffic. Vehicles were able to operate after a new track was constructed above the vulnerable section. However, temporary tracks alone may not provide a long-term solution, making alterna...